I though this might be some useful information for a lot of people. These crews only work on trails open to motorcycles so bear that in mind when looking at the dates for each ranger district.
This schedule changes yearly.
Happy trails...
The Trail Ranger program is in full swing after a couple of weeks of
training, including their last shift.
June 4-11 I took both the southwest and the roaming crews on the Mountain
Home Ranger district to give them an idea what the expectations are for
trail clearing. Over eight days the crews worked on the following trails.
This list is short, but the focus was on more heavy maintenance than just
clearing.
William Pogue 122- The trail is cleared in its entire length of 13 miles.
Several areas where the trail had sloughed or given away completely, were
rebuilt, but more work still needs to be completed. The lower end just
across the bridge where there is always a considerable amount of brush, is
now cleared 4’ on either side of the trail and throughout the length of the
trail.
Corral Creek 129-Cleared, brushed and portions of the trail are now
rebuilt.
Sheep Mountain 123- Cleared six miles of a 9 mile trail to the snow line.
Several water dips were installed to reduce erosion.
Roaring River 45- Just 1 mile of the 8 mile trail is cleared as the guys
found a lost person and took her back to safety.
Browns Creek 48- all 9 miles cleared
Haga 13- Four miles of the 8 mile trail is cleared from the middle fork of
the Boise. This trail was a project trail for the trail rangers to brush
the bottom of the trail and help with getting this trail up to a
sustainable condition. Blasting on the lower end has not yet occurred, but
should happen in the next couple of weeks. The delay has been the Fish
biologists sign off and the loss of the old district ranger.
Both Trail Ranger crews are currently out on shift. The roaming crew is
working on the Weiser Ranger District and the SW crew is maintaining the
Lowman Emmett stuff. When I bring up Lowman/Emmett I know there is question
about Silver creek/ Bull Creek. The Emmett Ranger District will have Silver
creek summit to Bull Creek open this year to motorcycles only. This is a
change from the past where the trail was open to Motorcycles and ATVs then
closed because of erosion. It is now open to motorcycles, horses, hiking
and bicycling only and will remain that way.
The next shift the Trail Rangers will be maintaining the Mountain Home
Ranger District on the Trinities July 2-9 and Fairfield Ranger district
(Baumgartner).
The following dates are when each district will be cleared
June 4--11 Mtn home/Idaho City June 4--11 Mtn home/Idaho City
June 18--25 Lowman/Emmett June 18--25 Weiser
July 2--9 Fairfield July 2--9 Mountain Home
July 16-23 Idaho City July 16--23 Mountain Home
Jul-Aug 30-6 McCall Jul-Aug 30--6 St Joe
Aug 13-20 Council/New Meadows Aug 13--20 Clearwater
Aug/Sept 27--3 McCall
Sept 10--17 Stanley
Sept/Oct 24--1 TBD
Idaho Department of Parks and Recreation
This schedule changes yearly.
Happy trails...
The Trail Ranger program is in full swing after a couple of weeks of
training, including their last shift.
June 4-11 I took both the southwest and the roaming crews on the Mountain
Home Ranger district to give them an idea what the expectations are for
trail clearing. Over eight days the crews worked on the following trails.
This list is short, but the focus was on more heavy maintenance than just
clearing.
William Pogue 122- The trail is cleared in its entire length of 13 miles.
Several areas where the trail had sloughed or given away completely, were
rebuilt, but more work still needs to be completed. The lower end just
across the bridge where there is always a considerable amount of brush, is
now cleared 4’ on either side of the trail and throughout the length of the
trail.
Corral Creek 129-Cleared, brushed and portions of the trail are now
rebuilt.
Sheep Mountain 123- Cleared six miles of a 9 mile trail to the snow line.
Several water dips were installed to reduce erosion.
Roaring River 45- Just 1 mile of the 8 mile trail is cleared as the guys
found a lost person and took her back to safety.
Browns Creek 48- all 9 miles cleared
Haga 13- Four miles of the 8 mile trail is cleared from the middle fork of
the Boise. This trail was a project trail for the trail rangers to brush
the bottom of the trail and help with getting this trail up to a
sustainable condition. Blasting on the lower end has not yet occurred, but
should happen in the next couple of weeks. The delay has been the Fish
biologists sign off and the loss of the old district ranger.
Both Trail Ranger crews are currently out on shift. The roaming crew is
working on the Weiser Ranger District and the SW crew is maintaining the
Lowman Emmett stuff. When I bring up Lowman/Emmett I know there is question
about Silver creek/ Bull Creek. The Emmett Ranger District will have Silver
creek summit to Bull Creek open this year to motorcycles only. This is a
change from the past where the trail was open to Motorcycles and ATVs then
closed because of erosion. It is now open to motorcycles, horses, hiking
and bicycling only and will remain that way.
The next shift the Trail Rangers will be maintaining the Mountain Home
Ranger District on the Trinities July 2-9 and Fairfield Ranger district
(Baumgartner).
The following dates are when each district will be cleared
June 4--11 Mtn home/Idaho City June 4--11 Mtn home/Idaho City
June 18--25 Lowman/Emmett June 18--25 Weiser
July 2--9 Fairfield July 2--9 Mountain Home
July 16-23 Idaho City July 16--23 Mountain Home
Jul-Aug 30-6 McCall Jul-Aug 30--6 St Joe
Aug 13-20 Council/New Meadows Aug 13--20 Clearwater
Aug/Sept 27--3 McCall
Sept 10--17 Stanley
Sept/Oct 24--1 TBD