Mountain Bike Reviews Forum banner
1 - 12 of 12 Posts

·
HIKE!
Joined
·
1,656 Posts
Discussion Starter · #1 · (Edited)
Okay, you saw that right, first trail work day of 2008, Sat, Jan 5, 8 am to Noon. We are going to do hand finish of the machine cut bench. There are 2 cones marking the section needing finish work. It is rakes and McLeods (mainly) to polish the last 1,500 feet or so. A big turnout of workers could have this all finished up. This is easier and rewarding work, so it'll go fast.

Post here if you've got q's. Get the word out, more folks need to see the trail project. We can do the finish work, then ride or run the trail out and back. Good fun. Black Hills of South Dakota, by the way.
 

·
HIKE!
Joined
·
1,656 Posts
Discussion Starter · #8 ·
Good working weather ahead, a bit warm, but it should be a fine day to do some finish work. We'll have tools out there.

DON'T block the gate! when you park in the lot.

Bring your bike or running/walking shoes if you want to check out the 2 miles done so far.
 

·
Registered
Joined
·
12 Posts
Another successful trail day on Sat. I saw all of the regulars and new faces. I think we have completed all the finish work behind the machine cut, which was the goal. Thanks to all that make time and come out to swing the tools. Bring out the bike and ride the trail, its very rewarding.
 

·
Registered
Joined
·
229 Posts
THANK YOU for all your hard work, along with everyone else. A SIGNIFICANT amount of work has been lifted from the shoulders of a few, that is going to result in more trails being planned and constructed (hopefully by contracted work). I am very proud of EVERYONE who has, and will be helping out in the near future.
thank you
dg
 
1 - 12 of 12 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top