Mountain Bike Reviews Forum banner

Rocky Hill Ranch 2021 Update

1229 Views 0 Replies 1 Participant Last post by  ridenfool
The owner has made a deal with a buyer for about 1000 acres of RHR. All trails North of the dual pipeline right of way (near where Off The Lip trail begins) will be closed at the end of the 2021.

This will leave about 6.5 miles of the 20+ miles of trail once the new property line is fenced.

Plans are in the works to add new trail on the remaining property. Current estimates indicate this could result in bringing the total up to 10 - 13 miles of trail, eventually.

Get out to RHR if you want to ride the legacy trails before they are no longer accessible. Get ready for some new stuff that might make up for the loss of those trails.

Link to UPDATE on RHR
1 - 1 of 1 Posts
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top