Joined
·
1,186 Posts
A ride sorta got scheduled on the MMBA board the other day. Details are; Meet at the PLRA beach parking lot at 10 AM (15 minute rule in effect), ride Pontiac Lake, then ride the powerline track from Teggerdine down to M-59, hit Duck Lake Rd. to Highland, ride loops A-D, ride back to PLRA. Not sure if anyone will finish the second lap at Pontiac... Should be around 65 miles total for the day.