For the last two days, Jason K. has been designing and helping to build our terrain park and pump track at Sugarbush. All I have to say is wow.
Planning.
Pointing.
Building.
Testing.
Retesting.
A new rock wall ride. The two boulders are on top of a 4-5 foot berm. You can ride the berm, the rock faces, over the top on a skinny tech line or gap the entire thing. Just saying.
The park should be rideable by early next week. Super Bravo spins in only 10 days. Hope to see you soon!
John
Planning.
Pointing.
Building.
Testing.
Retesting.
A new rock wall ride. The two boulders are on top of a 4-5 foot berm. You can ride the berm, the rock faces, over the top on a skinny tech line or gap the entire thing. Just saying.
The park should be rideable by early next week. Super Bravo spins in only 10 days. Hope to see you soon!
John