I rode Demo today at 10am. At the start of Buzzards, there is a sign stating the road will be closed through May 15th, but the road is not blocked off. I thought I heard some machinery as I rode up Buzzards, but did not see anything. At the right turn onto Aptos Creek fireroad, there was a sandwich board sign with info about the road closures that is on the internet elsewhere. I stayed to the left and rode toward Cusacks. After Cusacks, when I was back on Aptos Creek, at the closed gate that you ride around from the right, there was another notice posted about the planned road closures. I rode up to Ridge; nowhere along my route did I see any machinery or work crews. I saw 6 other mountain bikers, and 2 of them were on e-bikes.